Document Date
Meeting Description
Document Type
Meeting Date
Page Number
63
ASK DESCRIPTION
.0 - ENGINEERING STUDY
F-2947 Nashua Fee 190524 (ENG)
CITY OF NASHUA, NEW HAMPSHIRE
Heritage Rail Trail East
NASHUA 41742
Hayner/Swanson, Inc.
Labor Hours Matrix
HOURS
Principle Sur. Proj. Senior Senior Senior Junior
Surveyor Tech| Cad Tech | Field Tech | Field Tech
1.50 50 .00
TOTAL
HOURS
ENGINEER'S
ESTIMATE
Overhead/Burden (1.2683): $14,102
Subtotal $25,221
Fixed Fee (10%): $2,522
Expenses:
STUDY 183
HOURS COSTS ($)
1.0 - ENGINEERING STUDY 339 $28,183
2.0 - PRELIMINARY DESIGN 0 $0
3.0 - FINAL DESIGN 0 $0
" DESIGNPHASE TOTAL 33a | 528,183
5/24/2019
Page Image