CITY OF NASHUA, NEW HANIPSHIRE
Heritage Rail Trail fast
NASHUA 41742
CMA Engineers, Inc.
CMA ENGINEERS, INC.
PROJECT TASKS HOURS COST ($)
DESIGN PHASE
1.0 - ENGINEERING STUDY CMA Engineers 321 | $ 36,785
HSI 216 | $ 17,622
Terracon 901) $ 14,551
Ironwood 74/$ 5,397
Total 701 | $ 74,355
2.0 - PRELIMINARY DESIGN CMA Engineers 278 | $ 30,207
Ironwood 50/$ 3,743
Total 328 | $ 33,950
3.0 - FINAL DESIGN CMA Engineers 228 | $ 26,340
Ironwood 74/35 5,403
Total 302 | $ 31,743
DESIGN PHASE TOTAL: 1,331 | $ 140,048
P-2947 Nashua Fee 190614 (IGE) 6/14/2019