CHANGE ORDER
No. i
PROJECT: Phase Ti Landfill Expansion
OWNER’S CONTRACT NO: IFBO593-022019
EXECUTED CONTRACT DATE: April 14.2018
DATE OF ISSUANCE: Sentember 5, 2019 = =EPFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NA
OWWNER’s Purchase Order NO.: 148117
CONTRACTOR: Charter Contracting
ENGINEER: Sanborn Head Associates
‘You are directed to make the following changes in the Contract Documents:
Description:
The change order is a culmination of changes and delays directly related to the results
of a DES required groundwater separation study that altered the base grades of the landfill from what
was originally designed by Sanborn Head and Associates. The change in the base grades also resulted
in additional labor and material quantities
Change Order #1 lof?
Phase UT Landiill Expansion