ENGINEERING REPORT PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS
CITYFOWN OF NASHUA, NEW HAMPSHIRE
This AGREEMENT made and entered into at Hillsborough County, New Hampshire, this
day of 2019, by and between City‘Fewn of Nashua, New Hampshire, hereinafter
called the OWNER, and Hazen and Sawyer, hereinafter called the ENGINEER.
WITNESSETH:
WHEREAS, the OWNER intends to examine the need, alternatives and cost of constructing
Treatment Works including
City of Nashua’s CSO Long-Term Control to be updated_and projects identified to reduce or eliminate
CSO’s under a “Phase 2” CSO program. In addition, currently the City is also is subject to the 2017 New
Hampshire Small MS4 General Permit that allows stormwater drain pipes to discharge to local
waterways. The EPA allows municipalities like Nashua with multiple permits to use an integrated
planning approach to prioritize and schedule wastewater and stormwater projects based_on the financial
capability. This study will develop recommend projects to comply with the EPA’s CSO Policy
requirement for LTCP development, and development_of an Integrated Plan consistent with EPA
guidance and CWA requirements, meeting the goal of improved water quality that is affordable and
practical.
hereinafter called the PROJECT, and
WHEREAS, professional sanitary engineering services are required to prepare an engineering
report, and
WHEREAS, such services are of a distinct professional nature and hence not subject to the
bidding process,
NOW THEREFORE, in consideration of these premises and of the mutual covenants herein set
forth, the OWNER hereby retains the ENGINEER to furnish the following engineering services in
connection with the proposed PROJECT; and it is agreed by and between the OWNER and the
ENGINEER as follows:
Hazen CSO Long Term Control Plan Update Contract.docx 02/08/06