ARTHUR COLE PAINTING CORPORATION
Contract Painting
www.colepainting.com se vallcoverines
Millwork Finishing
Maintenance Programs
September 10, 2019
To: . Methuen Construction Coo 0
Attn: “> Don Hutchinson eae
oe - Superintendent |. .¢2 8. oo
Job: 0S _- Water Treatment facility areneten
oe ~ Mechanical Room 9:
- 2Sawmill Rd.
© Nashua, NH oo
Documents: On site estimate .
Scope
interior: ® Power wash Concrete Ceilings & CMU walls
Walls ° Paint Ceilings with 1 Coat primer and 2 Coats finish paint.
Ceilings © Paint Walls with 2 Coats Pro Industrial Acrylic Coating.
Floor e Concrete Floor and Pads to be thoroughly cleaned using Spiral
tip High pressure wash and detergent.
e Concrete Floor and pads to receive 2 Coats of Armorseal 1000
HS industrial Catalized Epoxy. Top Coat to be applied after
machinery has been installed.
® All Riser area @ pads shall be striped with Safety yellow paint
Note Please see the attached Product data Sheets recommended.
Total Labor | $7,865.00
Total Material | $3,010.00
Bob Cote
Estimator
Arthur Cole Painting Corporation
P.O. Box 16583 « Worcester, MA 01601 ° Phone: 508.799.9019 © Fax: 508.797.4049