97
Mechanical Room Painting
Scope; The below price is the cost incurred to paint Mechanical room, including power washing ceilings, walls, flaor and filing unused holes with mortar.
4-SUPPLEMENTAL COSTS
DESCRIPTION ary RATE UNIT SUBTOTAL
IASBUILT DRAWINGS
AR
SUBTOTAL $0.00
5-BURDEN
CATEGORY RATE
BURDEN RATE 34.00% $1,086.50
6-GG WORK TOTAL
SUBTOTAL (Item 4#2+3+4) $4,735.10
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST ary cost TOTAL
Cole
SUBTOTAL $10,875.00
3-FEE
GC (15% X lems 185 + 10% X items 28384 + 5% X item 7) $1,231.37
3-SUBTOTAL $16,841.47
BOND (1% X Hema} $168.41
GENERAL LIABILITY (1% X item 8) $168.41
9-TOTAL (Item 8 + Bond + General Liability) $17,178.30
Page 30f 3