Mechanical Room Painting
Scope: The below orice is the cost incurred to paint Mechanical room, including power washing ceilings, walls, floor anc filling unused holes with mortar.
1-LABOR
CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL TOTAL
NT
FOREMAN
UCK
SUBTOTAL $3,195,606
2-MATERIALS
DESCRIPTION QTy UNIT UNIT COST SUBTOTAL
Estimated
Consumables 5 500.00 $ 500.00 $ -
Dumpster / Disposal 5 750.00 $ 750.00 $ -
Mortar 4 5 41.25 § 45.00
i i i i
SUBTOTAL 3 45.00
3-EQUIPMENT
CATEGORY HRS RATE UNIT SUBTOTAL
VATOR PG300 $180.35 HR $0.00
VATOR CAT 330 $100.37
320 $58.71 $0.00
$61.23 $0.00
$17.00 3408.00
40
50.
SAW
RAULIC BREAKER 41
T 420 :
KLIFT LULL $30.01
185CFM $15.08
LIFT 79° $4.18
DRILL $120.06
SUBTOTAL $468.00