Lighting Change
Scope: Remove and replace lighting in Generator room per attached El! quote.
1-LABOR
CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL TOTAL
ERINTENDENT
$1713.00
ENGINEER $65.00
368.72
$79.69
YER 06
WRIGHT $69.72
$82.23
45
$0.00
2-MATERIALS
DESCRIPTION QTY UNIT UNIT COST SUBTOTAL
3 - $ -
$ - $ -
| | |
SUBTOTAL $ -
3-EQUIPMENT
CATEGORY HRS RATE UNIT SUBTOTAL
EXCAVATOR PC300 $180.35 HR $0.00
EXCAVATOR CAT 330 $100.37 HR 50.00
EXCAVATOR CAT 320 $58.71 HR $0.00
BUMP TRUCK $61.23 HR $0,00
TOOL TRUCK $17.00 HR $0.06
FRONT END LOADER 366.40 HR $0.00
DOZER $54.42 HR $0.00
COMPACTOR (WALK BEHIND) $35,883 HR $0.00
ROAD SAW $35.88 HR $0.00
HYDRAULIC BREAKER 345.57 HR $0.00
CAT 420 BACKHOE $41.49 HR $0.00
FORKLIFT CULE $30,014 HR $0.00
COMPRESSOR 185CFM $15.08 HR $0.00
PICKUP TRUCK $13.00 HR $0.00
CORE DRILL $120.00 DAY $0.00
SUBTOTAL $0.00
Page 2 of 3 8/26/2019 - 7:54 AM