SCHEDULE FOR BALANCE OF SEASON REQUIREMENTS
State agency location contacts. Higible Participants location contacts as well as NHDOT District Engineers, or ther
designated agents, shall be responsbie for placing additional orders, prioritized by district location during the
remainder of the contract period, Contractor shail be responsible for providing the location contact / cistict
engineer with a weekly delivery schedule. Said schedule shall be sent no later than Wednesclay of the week
prececing scheduled deliveries.
Pimery Contractor
Orders shall be delivered within FIVE (5) business days after notification to Coniractor. Requesied deliveries shall
not be required io exceed 3,000 tons per week per district. This requirement is in effect even if Primary Contractor
did not supply the initial fil at a specific location.
Secondary Contractor
Orders shall be_defivered within TWENTY (20) business days aifer notification to Contractor, Requested deliveries
shall noi be required to exceed 3,000 ions per week per district.
Source $peciilcations:
Coniractoris required to provide fhe source of where the salt is being produced. Hf the source of the salt
changes, the Contractor is required to contact the purchasing agent prior fo salt being delivered. The State
has the right fo reject any salt that comes from a different source without pfor approval.
Storage Specifications:
Contractor is required to provide lacation of where the saltis to be stored at prior to being delivered fo
NHDOT. If the location of the salt storage changes at any time throughout the contract, or if deliveries come
from a different location, the Contractor is required to contact ihe NHDOT Winter Maintenance Program
Specialist prior to sali being delivered. Soli piles are required io be covered at all times while at the Contractor's
storage arecs, except during active loacling of delivery vehicles, Salt that is nat covered could be considered
cause far rejection. NHDOT has the right to reject any sal? nat comes from a diferent storage area without
prior approval.
PRICING:
Highway District Rock Sati/ion Solar Salt/fon
Hwy District 1 $69.95/ton
Hwy District 2 $65.95/ton
Hwy District 3 $54.50/ion MA
Hwy District 4 $56.25/fon $56.25/ton
Hwy Distict 5/Central Turnpikes $49.50/ton $49 .50/ton
Hwy District &/Eastem Turnpikes $47.00/ton $47 .00/ton
QUESTIONS: Lavra Ingram, Purchasing Agent
fel: 608 271-2009
Email: laura.ingram@nh.gov