Questions from the Mzndatery Pre-Bid Meeting.
{3 this dasign Duild bid? This is a Construction Management project,
Wher da we want it on the street for construction? The first week of sept far Finance Committee Bpproval
would allow us to startin the October/November timeframe.
is this a closed circus or cpen circuit water source system? Closed.
is rangs on WSHP systam? Na, ifs on a separate system in mechanical! raom.
Do wa want to vaplacea R22 units or rairofit? Yes. Replace.
Oc wa know whan the Siemens Controls were installad? Yes. 2005,
Oo wa have capacity issues? We believe so
What manufacturer are heat puraos? Trane
Would we need a tamporery system in durng consiructian? Yes. We can’t clase tha building.
Are we replacing water boilar sn the add:tian® The recommendations fram tha SMRT study did net
recommended replacing the water boiler in the addition.
Would we considaz putting range system on rcoftan akova the tanga? Yes, lf the architect/enginear
racommendations daing it.