CRANE AND HOIST »™
CRANE BUILDERS, INSTALLERS AND TECHNICIANS
July 8, 2022 Quote # 33915
City of Nashua NWTF
2 Sawmill Road
Nashua, NH 03060
Attention: Noelle Osborne
Re: Fall Protection
Dear Noelle,
We have put together the following proposal for your review. Specifications follow:
VVVWV
Sd
eft 6 ¢@ @
(1) Gorbel Road Ranger Fall Protection Unit
Unit for use with (1) worker.
Towable to 65 M.P.H.
Gorbel model Ranger-H-1P-22-B.
Delivery and setup/demo included.
Total cost for Material and Delivery.......... $46,202.00
Prices less taxes.
Delivery: 4-6 weeks ARO.
Terms: Net 30
Pricing is firm for 30 days.
Credit card orders will add 6% to the sale price.
Permits if required will be an additional cost.
Notes/Clarifications:
¢
¢--¢-¢ ¢
500-1 Potash Hill Road, Tyngsboro, MA 01879 e TELEPHONE 800-909-2299 e www.masscrane.com
All painting will be standard oil-based paint for Mass Crane built structural steel systems unless otherwise
stated. Mass Crane built runway and bridge steel will be sandblasted prior to painting.
All paint for Gorbel type workstation cranes will be water-based paint unless otherwise stated
Epoxy and non-standard paint can be supplied for an additional cost.
Floor mounted disconnect and power to crane per NEC requirements by others
Mass Crane will provide its standard insurance certificate. If special requirements are needed, then Mass
Crane's insurance agent will review and advise.
Spare parts are not included unless otherwise stated.
1 Year parts and labor warranty included on factory defects
PE Stamp can be provided for a cost on a per job basis
If a training class is required as part of the scope our standard training class that has been created and
accepted by the state of MA will be the class that is presented. The training class, outline, handouts, quiz,
etc. cannot be modified on a per job basis.
(1) standard factory O&M manuals will be provided. If more than (1) copies are required or if additional