TITLE
Seopa: The below price is the cost Incurred to repalr the water seal on mixer DS. The Seal was found to be damaged, and SESD asked MCIS to repalr the seal prior to
assembling the new mixer shefi. Accens was instellad to the grea, the pleca was preparred for welding, and welding was performed par the Instructions of SESD In
rasponse to RFIOO?.
4-SUPPLEMENTAL COSTS
DESCRIPTION ary RATE UNIT SUBTOTAL
t
SUBTOTAL $0.00
ig-BURDEN
CATEGORY RATE
BURDEN RATE 34.00% $0.00
free WORK TOTAL
SUBTOTAL (Item 1424344) $0.00
A
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST Qty COST TOTAL
to
SUBTOTAL $10,000.00
B-FEE
GO (15% X Hams 14.5 + 10% XM tems 26364 + 696 X em 7} $500.00
Is-SUBTOTAL $10,500.00
BOND {1% X Hem®) $105.00
GENERAL LIABILITY (1% X item 8) $105.00
prore. {tem 8 + Bond + Genera! Liability} $10,710.00
Page 3 0f3 10/1/2015: 8:35 AM