Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/3/2022 - P46

Finance Committee - Agenda - 8/3/2022 - P46

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Thu, 07/28/2022 - 10:40
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2022 - 00:00
Page Number
46
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

June 13", 2022
City of Nashua, New Hampshire
229 Main Street
Nashua, NH 03060-2019

Attn: William “Bill” Keating
Facility Engineer

Re: WWTP Primary & Secondary Digester Coatings
IFB1092-010522

Subject: COR#801r1 — Miscellaneous Changes
Dear Mr. Keating,

We are please to provide you with the following proposal for the referenced project:

1) Primary Digester Metal Skirt Wall
A. Price: $11,300.00
B. Scope: ~2110 SE Power wash and recoat — 2cts of Sherwin-Williams SherCryl 1300 Semi-
Gloss
C. Color: “Alfalfa” TN105GN

2) Ladder on DeChlor Building
A. Price: $9,700.00
B. Scope: 20.2’ heigh, 2’ wide, cage from 6’ up to top of ladder. Sandblast & repaint. Same paint
system and color as Energy Recovery Building Stairway (Contract Alt A)
C. Color: ANSI #70 Gray

3) Wet Weather Raw Sewage Pipe Lateral
A. Price: $850.00
B. Scope: Power tool clean, prime, intermediate & finish paint with same coating system as
secondary digester steel.
C, Color: To be determined

4) Concrete Deck Coating at CSO#002
A. Price: $29,850.00 (Not to Exceed)
B. Scope:
i. Surface Preparation:
a. Clean existing concrete roof of CSO#002 of dirt, debris, vegetation, etc...
b. Remove existing concrete roof coating down to bare concrete via Ultra High
Pressure Water Jetting (“UHP”)

Page Image
Finance Committee - Agenda - 8/3/2022 - P46

Footer menu

  • Contact