ARTICLE 2— WORK TO BE PERFORMED
Except as otherwise provided in this contract, CONTRACTOR shall furnish all services,
equipment, and materials and shall perform all operations necessary and required to carry out and
perform in accordance with the terms and conditions of the contract the work described.
DESCRIPTION OF WORK:
(1) Site Prep and Base build
>
Removal of approximately 200 cubic yards of wood chips, with City of
Nashua to supply 3 Dump Trucks, with Drivers, to haul local landfill for
disposal
City Of Nashua to supply 1,200’ of nailer board to secure perimeter and
contain padding zones
Contractor to spread, smooth and compact approximately 200 tons of
crusher run aggregate % inch with screenings
(2) Installation of approximately 9,600sf of Playground 60 Turf with 2” padding with 9°
safety fall rating for all safety fall zones
667°x15° =10,005 SF of IntelliTurf Playground 60 Turf
2” PolyGreen Playground Padding in compliance for all safety fall zones
Seam Tape and Adhesive
4,500 stainless steel power staple to secure perimeter to nailer board
30,000 LBS of Silica Sand Infill
9,600 SF to be power broomed
ARTICLE 3 — PERIOD OF PERFORMANCEB-1L I
CONTRACTOR shall perform and complete all work on or before_May 30, 2020,
date shall only be altered by mutually approved written agreement to extend the period of
performance or by termination in accordance with the terms of the contract. CONTRACTOR
shall begin performance upon receipt of an Executed Contract and a valid Purchase Order issued
from the City of Nashua.
ARTICLE 4 —- CONTRACT SUM
Subject to additions and deductions by Change Order, the OWNER shali pay CONTRACTOR,
in accordance with the Contract Documents, the Contract Sum of:
QNE HUNDRED NINE THOUSAND SEVEN HUNDRED NINETY DOLLARS
(3 109,790.00)
The Contract Sum shall include all items and services necessary for the proper execution and
completion of the Work.
Page 2 of 12