Document Date
Meeting Description
Document Type
Meeting Date
Page Number
124
Credit Request for Reducing Plant WaterPump Panel Feeder (200 Amp to 100 Amp Reduction)
Scope: Credit Request for Reducing Plant Water
Pump Panel Feeder (200 Amp to 100 Amp Reduction}
4-SUPPLEMENTAL COSTS
DESCRIPTION QTY RATE UNIT SUBTOTAL
T DRAWINGS
SUBTOTAL $0.00
|5-BURDEN
CATEGORY RATE
BURDEN RATE 34.00% $0.00
f6-GC WORK TOTAL
SUBTOTAL (Item 1+2+3+4) $0.00
|
'7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST QTY COST TOTAL
SUBTOTAL {$660.33}
{8-FEE
GC (15% X items 185 + 10% X Items 2&384 + 5% X item 7)
}8-SUBTOTAL {$660.33}
BOND (1% X Items)
GENERAL LIABILITY (1% X Item 8)
i (iter 8 + Bond + General Liability)
($660.33)
Page 2 of 2
10/15/2019 - 11:47 AM
Page Image