Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/3/2022 - P36

Finance Committee - Agenda - 8/3/2022 - P36

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Thu, 07/28/2022 - 10:40
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2022 - 00:00
Page Number
36
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

Due to the built-in custom light control per luminaire, pole locations need to be confirmed prior to production. Changes to
pole locations after the product is sent to production could result in additional charges.

Notes

Quote is based on:

e Shipment of entire project together to one location.

e Structural code and wind speed = 2015 IBC, 120 mi/h, Exposure C, Importance Factor 1.

e OQwner is responsible for getting electrical power to the site, coordination with the utility, and any power company
fees.

e Includes supply and installation of Musco system including underground wiring and conduit, service entrance panel
board, and controls by a licensed contractor.

e Standard soil conditions — rock, bottomless, wet or unsuitable soil may require additional engineering, special
installation methods and additional cost.

e Confirmation of pole locations prior to production.

Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional
details.

Alan Grady

Sales Representative

Musco Sports Lighting, LLC
Phone: 207-604-8748

E-mail: Alan.Grady@Musco.com

OOOO
MISCO Raa

2016, 2021 Musco Sports Lighting, LLC -4- M-2168-enUS-10

Page Image
Finance Committee - Agenda - 8/3/2022 - P36

Footer menu

  • Contact