Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/3/2022 - P34

Finance Committee - Agenda - 8/3/2022 - P34

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Thu, 07/28/2022 - 10:40
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2022 - 00:00
Page Number
34
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

Installation Services Provided

Customer Responsibilities:

1. Complete access to the site for construction utilizing standard 2-wheel drive rubber tire equipment.

2. Locate existing underground utilities not covered by your local utilities. (i.e. water lines, electrical lines,
irrigation systems, and sprinkler heads). Musco or Subcontractor will not be responsible for repairs to
unmarked utilities.

3. Locate and mark field reference points per Musco supplied layout. (i.e. home plate, center of FB field)

4. Pay for extra costs associated with foundation excavation in non-standard soils (rock, caliche, high water

table, collapsing holes, etc.) or soils not defined in geo-technical report. Standard soils are defined as
soils that can be excavated using standard earth auguring equipment.

Pay any power company fees and requirements.

Pay all permitting fees and obtain the required electrical permitting.

Provide area on site for disposal of spoils from foundation excavation.

Provide area on site for dumpsters.

Provide sealed Electrical Plans. (If required)

OONDN

Musco Responsibilities:

1. Provide required foundations, poles, electrical enclosures, luminaires, wire harnesses, and control
cabinets.

2. Provide layout of pole locations and aiming diagram.

3. Provide Contract Management as required.

4. Provide stamped foundation designs based on soils that meet or exceed those of a Class 5 material as
defined by 2018 IBC Table 1806.2.

5. Assist our installing subcontractor and ensure our responsibilities are satisfied.

Subcontractor Responsibilities
General:

4. Obtain any required permitting.

2. Contact your local udig for locating underground public utilities and then confirm they have been clearly

marked.

3. Contact the facility owner/manager to confirm the existing private underground utilities and irrigation
systems have been located and are clearly marked to avoid damage from construction equipment. Notify
owner and repair damage to marked utilities. Notify owner and Musco regarding damage which occurred
to unmarked utilities.

Provide labor, equipment, and materials to off load equipment at jobsite per scheduled delivery.

Provide storage containers for material, (including electrical components enclosures), as needed.

Provide necessary waste disposal and daily cleanup.

Provide adequate security to protect Musco delivered products from theft, vandalism or damage during

the installation.

8. Keep all heavy equipment off playing fields when possible. Repair damage to grounds which exceeds that
which would be expected. Indentations caused by heavy equipment traveling over dry ground would be
an example of expected damage. Ruts and sod damage caused by equipment traveling over wet grounds
would be an example of damage requiring repair.

9. Provide startup and aiming as required to provide complete and operating sports lighting system.

NOaP

QOOO
MNUSCO ee

2016, 2021 Musco Sports Lighting, LLC -2- M-2168-enUS-10