Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/6/2019 - P79

Finance Committee - Agenda - 11/6/2019 - P79

By dnadmin on Mon, 11/07/2022 - 13:02
Document Date
Fri, 11/01/2019 - 15:04
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/06/2019 - 00:00
Page Number
79
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__110620…

EXHIBIT A

Salem Street Tot Lot

Design Number: 40919-DM-4 - Compliance and Technical Data
Reference Document: ASTM F1487

Pre- Post-
Unit Totat Consumer CcO2e Actlve
Ref. ASTM = Welght Recyded Content Footprint Install Concrete Play
No. Part No, Qty. Description Status {ibs} (tbs) (kgs) Users Hours (Y¥ds3} Events

@> aAst™ F1487

The lay-out for this custom playscape, design number 40919-DM-4, has been configured to meel the requirements of the ASTM F1487 standard. in
addition, each of the above components listed as "Certified" hava been tasted and are IPEMA cartified. Components listed as "Not Applicable“ do nat fall
within the scope of the ASTM F1487 standard and have not been tested. {PEMA certification can be verified on the IPEMA website, www.ipema.org. In the
interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

@} 20210 ADA Standards for Accessible Design

The tay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Depariment of Justice when installed over a properly maintained
surfacing material that is in compliance with ASTM F1951 “Accessibility of Surface Systems Under and Around Playground Equipment" as well as
ASTM F1292, "impact Attenuation of Surfacing Materials Within the Use Zane of Playground Equipment", appropriate for the fall height of the structure.

4 Installation Times

installation times are based on one experienced Installer. A crew of three experienced Individuals can perform the installation within the given time, each
member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, pach member will work 10 hours on tha installation for a
total of 30 hours on the project.)

(@ Carbon Footprint

Ths CO2Ze (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from
harvesting raw materials to the time it leaves our shipping dock. Playworid Systems nurtures a total corporaia culture that is focused on eliminating carbon
producing procasses and products, reducing our use of preclous raw melerials, reusing materiais whenever possible and recycling materials at every
opportunity. Playworld Systems eiected to adopt tha Publicly Available Specification; PAS 2050 as published by the British Standards Institute and
spansorad by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas
emissions in services and goods throughout their entire lle cycle.

@} Pre-Consumer Recycle Content

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initlat manufacturing
process and is being radirected io a separate manufacturing process to became a different product. E.g. 100% of our Aluminum Tubing is made trom
captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels,

@} Post-Consumer Recycle Content

A measurement, in pounds, that qualifies the amount of material that was once another product thal has completed its fifecycle and has been diverted from
a landfill as a solid waste through racycling and is now being used in a Playworld Systems’ product. E.g. *°20% to 40% of the steal in our steel tubing and
sheet steel have been diverted from landfills. Automobiles are scrapped and recyciable steel Is purchased by the steel mill that produces our raw product.
** The amount a! Post-Consumar recycled steel fcluates daily based on the availability of the recycled steal.

A$ PLAYWORLD

Thursday, August 29, 2029 Page 2 of 2 Playword.com

Page Image
Finance Committee - Agenda - 11/6/2019 - P79

Footer menu

  • Contact