Document Date
Meeting Description
Document Type
Meeting Date
Page Number
9
EQUIPMENT LIST FOR AREAS SHOWN Labine Park Softball
el BP
TOES TS GRID SUMMARY
cin oma aed ——
——___________—_1.1 | J
Sire: bregaler 278 / 275’ / 265°
Draw Chart and/or the “Musco Control Stem Semmary~
for electrical zing.
Installation Requirements: Mesut assure s 6
nominal voltage at line side of the driver and structures
| kecated within 3 feet (im) of design locations
pent y ergp pny al erie ry aaa
Spee Ugttng, LLC ©1901, 202! Masco Sports Lighting, LLC
ILLUMINATION SUMMARY
ENGINEERED DESIGN By: - File #208204 (A-LS5} - 13-Oct-21
Page Image
