Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/3/2022 - P8

Finance Committee - Agenda - 8/3/2022 - P8

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Thu, 07/28/2022 - 10:40
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2022 - 00:00
Page Number
8
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

EQUIPMENT LIST FOR AREAS SHOWN Labine Park Softball
: Nashua, NH
GRID SUMMARY
Name Softball
See: invegaler 278 275 / 265°
Spacing: DO x DO

|b queramteed per your Musco Weeranty document and

| includes 2 0.95 dirt deprecation factor.

Field Messurements: Individual Geld ereasat erments mey very
from cormeuter<calculeted predictions and should be taken
ip accordance with ESA #9415.

| Hectrical System Requirerests fefer to Arrperage
Draw Chart and/or the “Musco Control Sytem Summary”
for electrical sizing.

- inatallation Requiremests. Results essume + 3%
nominal voltage at line side of the driver and structures
located within 3 feet (im) of design locations

—
—<
—
a
ae
st
J
—y

5+

——

M

Not te be reproduced in whote or pet witout the writer cormert of Musso
Spore Ughtng, LLC. ©0361, 202% Museo Sports Lighting, LLC

ILLUMINATION SUMMARY

ENGINEERED DESIGN By: - File #208204 (A-LS5} -

Page Image
Finance Committee - Agenda - 8/3/2022 - P8

Footer menu

  • Contact