ENGINEERING CONSTRUCTION PHASE CONTRACT
For Professional Services for Treatment Works
a. | The ENGINEER agrees to provide
at least one Registered Prefessional-Civit
Engineer Resident Project
Representative (RPR) on the project site
and-one-or more-inspectors as necessary
(fall_er—part time) to assist the
ENGINEER in the work of General
Administration as described under I(A)
and in observing construction activity for
compliance with the contract documents
and any associated change orders. The
DIVISION shall be notified in writing of
the name of the RPR RPR Resident Engineer;
inspectors, and shall be provided with a
brief history of the RPR’s Resident Ensi-
neers construction experience. The RPR
ai
shall be in the employ of and under direct
control of the ENGINEER. It is further
agreed that failure of the RPR Resident
Engineer to administer the PROJECT to
the satisfaction of the DIVISION or
OWNER is deemed to be sufficient basis
for his removal from the PROJECT and
replacement.
b. The ENGINEER agrees to provide
supervision of initial start-up and opera-
tion and for services during the twelve-
month warranty period and to prepare the
Project Performance Certification and
associated documentation.
c. Preparation of an Operation and
Maintenance Manual for approval by the
DIVISION. After DIVISION approval,
the ENGINEER agrees to supply five (5)
sets of the completed manual, one (1) of
which will be for the DIVISION.
d. _—- Preparation of record drawings of
the work as constructed. Three (3) sets of
prints to be fumished, one (1) of which
shall be for the DIVISION.
Il. The OWNER'S Responsibilities
A. Assist the ENGINEER by placing at his dis-
posal all available information pertinent to the PRO-
JECT, including previous reports and other data rela-
tive to the reports.
B. Make provisions for the ENGINEER to enter
upon public and private lands, municipal
facilities and industrial establishments as
Construction Phase Engineering
Ii.
Page 3 of 6
required to perform work under this AGREE-
MENT.
C. The OWNER also agrees to comply with DI-
VISION and Federal (Where applicable) requirements
as they relate to this project.
Compensation to be Paid the ENGINEER
A. MethodofPayment Amount of Fee
1. Payment to the ENGINEER, for services
rendered, shail be according to the following
schedule:
Statements will be rendered (with modi-
fications if necessary) monthly with bill-
ing by the hour and actual direct labor
rates times a net multiplier of 2.9477
(ndirect Rate of 167.97% with mark-
up of 10%) rate-by labor category with
markup and incidental expenses in ac-
cordance with the attached fee schedule.
2. The OWNER agrees to pay and the
ENGINEER agrees to accept for all services
under this AGREEMENT, a fee not to exceed
One-hundred-forty-eight thousand
eight hundred Dollars
($148.800.00)
B. Limits of All Payment
1. The ENGINEER further agrees that the
following fee for his services under I (A)(1), for
Construction Administration on this PROJECT,
(exclusive of work performed by resident engi-
neering staff) is adequate to complete the work
and shall not exceed
Seventy-five thousand, seven hundred
DolHars
($75,700.00)
2. Payment to the ENGINEER for resident
engineering and other special services shall be
as follows:
a. Resident engineering and-suppert-
ing-staff (as agreed to by the OWNER and
DIVISION) as described under I (A)(2-
)(a) for a period of 60 working days, an
amount not to exceed
Forty-four thousand, ovo
hundred Dollars
08/20/07
