Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 12/4/2019 - P118

Finance Committee - Agenda - 12/4/2019 - P118

By dnadmin on Mon, 11/07/2022 - 13:01
Document Date
Wed, 11/27/2019 - 14:04
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/04/2019 - 00:00
Page Number
118
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120420…

ms a
gt
mere

vhb Design Services & Project Management of Downtown Riverfront Implementation
October 31, 2019

Lead Consultant: VHB
Support from: Halvorson, HL Turner

1.4.12 - Riverbank Restoration + New Access

This sub area will likely include enhancing the space between the paved trail and the
water's edge. VHB will examine potential improvements along the river's edge to enhance
aesthetics, improve visibility and access to the river, conduct bank stabilization, and
potentially treat stormwater. There may also be opportunities for small overlooks, and
selected locations for display of public art, signage and lighting. The City is currently
addressing the invasives problem in advance of this project, but there may be
opportunities to modify the ground cover on the banks to mitigate invasives long term.
VHB will rely on guidance from HL Turner on floodplain elevations and restrictions on
filling.

Product: Include up to two (2) design alternatives including plans, typical cross sections,
sketches and one (1) perspective as appropriate to define the proposed improvements.
Lead Consultant: VHB

Support from: AL Turner, Halvorson

1.4.13- ADA Accessible Ramp to Cotton Transfer Bridge

An ADA accessible bike/pedestrian ramp will be developed to connect the ground level
multiuse path up to the Cotton Transfer pedestrian bridge. The intent will be to utilize
similar design elements as the existing ADA ramp on the apposite side of the river. The
work will be done with consideration for avoiding impacts to the floodplain and floodway.
VHB will complete the design with input from Halvorson and will coordinate with Lumen
Design Studio and Fitzemeyer & Tocci for lighting the structure. This project component
may be a good candidate for an accelerated schedule and “early success” assuming
environmental permitting will not hold it back.

Product: Provide up to two (2) design alternatives including plans, sections and sketches as
appropriate to define the proposed improvements.

Lead Consultant: VHB
Support from: HL Turner, Lumen Design, Fitzemeyer & Tocci

10

Page Image
Finance Committee - Agenda - 12/4/2019 - P118

Footer menu

  • Contact