CHANGE ORDER
No. |
PROJECT NAME: TRANSIT - 1 - 8 Passenger Front Runner Van from New England Wheels
OWNER’S CONTRACT NO:
EXECUTED CONTRACT DATE: September 19, 2019
. OWNER: City of Nashua, NH
OWNER’s Purchase Order NO.: PO 153288
CONTRACTOR: New England Wheels Inc.
ENGINEER: NA
You are directed to make the following changes in the Contract Documents:
Description:
In August, the Nashua Transit System (NTS) was awarded $110,000 dollars in 5310 funds from the State of NH to
purchase 1 Low Floor Cutaway Van.
The City entered into a contract with New England Wheels on September 19, 2019 for the following amounts:
1 Front Runner Van for a total of $123,894
Rhe City of Nashua and NE Wheels had a pre-production review of the bus build and a number of items were added or
removed to enhance the safety and functionality of the new bus.
The changes resulted in a credit of $1,305 for the one van, and include the following:
© Side facing seats and arm rests replace 2 standard passenger seats,
e Selection of alternative seat fabric and additional of seat pillow tops.
e Addition of wheelchair retractable tie downs, Jap and shoulder belt.
e Addition of Modesty panels and rear storage rack.
e Rear bumper selection changed to a less expensive option.
e Removal of front exterior cross over mirror.
© Removal of rain gutter as one is built into the rooftop.
Original Cost Reduction in Cost Revised Cost
$123,894 $1,305 $122,589
Justification:
Additional items were added to enhance the safety and functionality of the new fleet,
Change Order #1 1 of 2
NE Wheels Front Runner Van