Prepare 3-D CAD base plans and general building massing for the
id observation during the initial site visit.
aw the impact of existing site issues on potential planning
op
Structu Engineering - Phase 1 will consist of a review of the
1977..and c. 2000 building design documents as made
wher to determine the approximate allowable
oof Level framing, columns and foundatio
ddition. Should the results of the first ph
able load capacity for an additional
ng to Phase 2. (please refer fo
ection for Phase 2)
existing PD facility based on drawings provided by the PD, and visual
TASK 3 - INVESTIGATE:
Our team will prepare conce
= Proposed additions:
the existing site ci
Two (2) — progress
meetings with the
Police Department
and the Project
Steering Committee
to review the Concept
Design and Options
of Probable Cost
ting the approved Space
sign, and Site Layouts for the:
\ovation to the existing PD Facility
ions are included 2
e needs for project phasing to acknowledge the
r continued operation of the existing PD facility.
e Line: working with the PD and the Committee we will
).a-project implementation time line for the proposed projects,
on the PD’s plan to implement the various components of the
Cost Escalation: reflect projected future estimated construction cost
escalation for phased project implementation and estimated
One (1} — meeting
with the City and
Committee to review
interim Budget and
Proposed Project
Schedule