City of Nashua, NH PD Facilities Study
December 3, 2019 (revised December 6, 2019) Page 2
The existing Main Police Department Facility consists of a two story building with a full basement, and is
comprised of the original c. 1970 building and a c. 2000 addition. The building also features a one story
vehicle maintenance facility.
GROSS AREAS:
EXISTING BUILDING NEW ADDITION SALLYPORT ADDITION LOA,
B 9,865 7,275 0 17,140
j 11,730 10,767 1,Z50 23,121
2 13,559 8,082 620 22,261
35,154 S.F. 25,518 SF. 1,850 SF. | 62,522 SF.
PROJECT TEAM
The project team for the Study is comprised of the following:
e Lavallee Brensinger Architects — Project Management, Programming/Planning,
Conceptual Architectural Design
e Foley Buhl Roberts — Structural Analysis of the c. 1997 original building and the c. 2000
addition.
e Yeaton Associates - MEP/FP Engineering Consulting for the proposed expansion
e Jobin Construction Consultants — Conceptual Cost Estimating Services
e Hayner Swanson Inc. ~— Civil Engineering (Only required if planning indicates the need to
expand outside the existing building footprint or make alterations to the existing site
layout)
SCOPE OF BASIC SERVICES
Lavallee Brensinger Architects services and responsibilities shall be limited to Architectural Programming,
Planning, and Conceptual Design Services including limited scope Engineering Services related specifically
to the project scope as defined in this Agreement.
Our professional services include the following specific items: _
CATEGORY OF SERV MEETINGS —
TASK 1~SPAC!
Review the Exist
Program Repo!
One (1) — Project
Kick-off meeting and
existing site and
building facility tour
with the project team
Two (2) — On Site
programming
meetings with the
Police Department
and Project Steering
Committee
axt phase of the Study.
REVIEW CURRENT PD FACILITY
sk 1, our team will prepare planning and site
ions on the existing PD site.
W of the existing building and site documentation for the PD
ade available by the Owner.