Finance Committee - Agenda - 2/21/2018 - P227

By dnadmin on Mon, 11/07/2022 - 11:48
Document Date
Wed, 02/21/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/21/2018 - 00:00
Page Number
227
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__022120…

EXHIBIT B-1 - SUMMARY OF ESTIMATED STAFF EFFORT (HOURS) AND COSTS

DESIGN PHASE FOR PRIMARY TANK UPGRADES
CITY OF NASHUA, NH

TASK DESCRIPTIONS
Typical Salary Rate

Principal-in-
Charge
$67.00

Project
Manager
$56.00

Sr. Technical
Advisor
$49.00

Lead Project
Engineer
$36.00

Project
Engineer
$33.50

Sr. Project
Engineer -
Civil
$43.00

Project
Architect
$54.00

Sr. Project

Engineer -

Structural
$56.00

Project
Engineer -
Mechanical

$46.00

Sr. Project

Engineer -

Instrument.
$53.00

Sr. Project

Engineer -

Electrical
$55.00

CAD
Technician
$25.00

Admin.
Assistant
$20.00

TOTAL
HOURS

NON-LABOR

SUBS

DIRECT LABOR
COST

TOTAL

SUB-TOTALs

Design of Primary Tanks Upgrade

!. Preliminary Design

A_ Conduct kickoff workshop

a

a

12

a

2

Q

°

o

34

$200.00

$0.00

$1,322.00

$4,099.15

B_ Prepare base plans

10

16

29

$150.00

$0.00

$898.50

$2,800.06

C Prepare and issue draft TMs:

1 Evaluate design reqs for upgraded chain &
flight mechanism (include 1 day of site visits to
other WWTF with staff}. Evaluate options for
relocation of drive/return shafts. Draft TM.

36

42

$200.00

$0.00

$1,542.00

$4,748.02

2 Evaluate options for new sludge withdrawl
system for basins 3, 4, 5. Draft TM.

16

$0.00

$0.00

$662.00

$1,952.52

3 Determine options for new access hatches
over sludge wells, draft TM.

$0.00

$0.00

$281.00

$828.79

4 Access condition of primary pumps with
mfgr's rep and determine rehab requirements.
Draft TM.

12

$150.00

$0.00

$530.00

$1,713.20

5 Inspect odor control fan with mfgr's rep to
determine rehab reqs. Inspect grease/mist
eliminator, fan enclosure and carbon vessel
with mfgr's rep and access upgrade needs.
Draft TM.

16

24

$150.00

$0.00

$936.00

$2,910.67

6 Evaluate scum disposal and handling
alternatives including screening and
thickening, pumping, scum well upgrades (1-
day of site visits to other WWTF with staff).
Draft TM

10

70

$200.00

$0.00

$2,618.00

$7,921.61

7 Evaluate options to prevent floatables from
accumulating in primary influent channel, draft
TM.

10

$0.00

$0.00

$683.00

$2,014.46

8 Evaluate gravity thickener loadings with regard
to typical loading rates, access chemical
addition alternatives and options to improve
flow split. Draft TM.

36

$0.00

$0.00

$1,716.00

$5,061.22

9 Conduct pipe thickness testing to confirm
suitability of piping. Summarize recommended
piping, fitting and valve modifications. Draft
TM. Assume 2 days on-site and assistance
from Nashua staff.

20

26

$250.00

$400.00

$729.00

$2,800.13

10 Evaluate requirements to allow tanks to be
drained through sludge withdrawl lines, draft

13

$0.00

$0.00

$393.00

$1,159.13

11 Building Design Disclipines shall inspect
existing facilities and prepare preliminary
design technical memos summarizing
anticipated improvements as follows:

(a) Assess the condition of the existing concrete
in tanks, assume 1 site inspection and
assistance from Nashua staff.
Recommendations summarized in draft TM.

14

20

$150.00

$0.00

$995.00

$3,084.68

(b) Draft instrumentation TM memo to summarize
exist. control system & recommended
improvements. Including monitoring system
for the clarifier mechanism & proposed
changes to the sludge withdraw! system.

24

36

$0.00

$0.00

$1,616.00

$4,766.28

(c) Electrical TM outlining requirements for new
electrial gear.

32

$0.00

$0.00

$2,104.00

$6,205.60

(d) Draft architectural TM summarizing existing
code issues in Primary Gallery and stairwell
and recommendations for space upgrades.

10

33

$0.00

$0.00

$1,422.00

$4,194.09

Page Image
Finance Committee - Agenda - 2/21/2018 - P227