Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/21/2018 - P220

Finance Committee - Agenda - 2/21/2018 - P220

By dnadmin on Mon, 11/07/2022 - 11:48
Document Date
Wed, 02/21/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/21/2018 - 00:00
Page Number
220
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__022120…

AMENDMENT NO. 1
TO
ENGINEERING DESIGN PHASE
CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN
CITY OF NASHUA
AND
WRIGHT-PIERCE

FOR
PRIMARY TANKS UPGRADES
DATED APRIL 20, 2017

This AMENDMENT No. 1, dated is attached to and made part of the
CONTRACT between the City of Nashua, New Hampshire (hereinafter called OWNER) and
Wright-Pierce (hereinafter called ENGINEER), dated April 20, 2017, for Professional Engineering
Design Phase Services.

WHEREAS, the OWNER would like to proceed with final design and bidding services for the Primary
Tank Upgrades based on the Preliminary Design Report prepared by ENGINEER dated January 5,
2018.

NOW, THEREFORE, in consideration of said AGREEMENT and other good and valuable
considerations, it is hereby agreed and acknowledged by and between OWNER and ENGINEER to
amend the AGREEMENT as follows:

1. The AGREEMENT shall be amended to include this Amendment, a copy of which shall be
attached thereto and made a part thereof.

2. In Exhibit A — Scope of Services, the draft Scope of Work for Task IIT — Final Design for
Primary Tank Upgrade and Task III — Bidding Phase Services shall be deleted in entirety from
the end of Task I — Prepare Preliminary Design Report for Primary Tank Upgrade. The
attached Exhibit A-1 shall be added to the end (at end of Task I — Prepare Preliminary Design
Report for Primary Tank Upgrade).

3. Compensation will be in accordance with Section IV of the original agreement except as
modified below:

A. Delete Paragraph IV.A.2A. in entirety and replace as follows:

“2A. The OWNER agrees to pay and the ENGINEER agrees to accept for all services
under Exhibit A-1, Task Il — Final Design, a fee not to exceed

Two-hundred-seven-thousand, four-hundred Dollars

($207,400.00).

Amendment #1
Primary Tanks Upgrade Page 1 of 3

Page Image
Finance Committee - Agenda - 2/21/2018 - P220

Footer menu

  • Contact