NASHUA 16314 — East Hollis & Bridge Street Intersection Improvement Project
Scope of Work and Task Descriptions
October 18, 2017
Phase IJ — ACOE Coordination
MJ will notify the Army Corps of Engineers (ACOE) of the project to obtain feedback on potential
concerns with the levee. It is anticipated that notification and any subsequent coordination with
ACOE will be through written correspondence and one meeting with ACOE staff.
Assumptions
1.
sae enr oof ©
= Oo
12.
NHDOT Specifications, Standards, and nomenclature will be used for the construction
documents.
It is assumed that the NRPC has information and availability to provide information on future
traffic volumes in this area.
A single construction contract will be used to complete the proposed work.
The cost of providing officers and flaggers required for traffic control during survey is included.
The City will arrange for meeting space for committee and public meetings.
Coordination with existing utility companies is anticipated and included in this scope.
The project will not impact the levee along the Merrimack River.
The wetland delineation flagging will be surveyed using a GPS unit with sub-meter accuracy.
A total of two (2) resource agency meetings are proposed.
_ FHWA is the lead federal agency for the NEPA Categorical Exclusion.
_ Permit fees will be paid for directly by the City of Nashua and are not included in this scope of
work or fee proposal.
It is assumed no wetland mitigation will be required.