  2. Finance Committee - Agenda - 8/17/2022 - P246

Finance Committee - Agenda - 8/17/2022 - P246

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Fri, 08/12/2022 - 13:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/17/2022 - 00:00
Page Number
246
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081720…

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the day of in the year 2022 by and between
the City of Nashua, New Hampshire (hereinafter called OWNER) and William P. Davis Excavation, LLC
and its successors, transferees and assignees together hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as
follows:

ARTICLE 1 - WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.

ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part
is generally described as follows:

This project involves the reconstruction of pedestrian sidewalk ramps and landings on East Dunstable Road and
Manchester Street to ADA standards. Work shall include new and reset granite curbing with new concrete
sidewalk ramps and landings on East Dunstable Road and on Manchester Street at Reservoir Road and
Monadnock Street, and with new asphalt sidewalk ramps and landings at the remaining locations on
Manchester Street. The work shall also include adjustment to drainage structures and traffic signs within the
sidewalk ramp and landing work areas. The CONTRACTOR will provide all labor, equipment, and material to
construct the improvements at the following intersections and as shown on the “2022 Sidewalk Curb Ramps
Replacement Project” plans.

ARTICLE 3 - ENGINEER
3.01 Division of Public Works
Engineering Department

9 Riverside Street
Nashua, NH 03062

is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and

responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.

ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and Completion and Readiness for
final payment as stated in the Contract Documents are of the essence of the Contract.

AG - 1 of 7