Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 4/18/2018 - P48

Finance Committee - Agenda - 4/18/2018 - P48

By dnadmin on Mon, 11/07/2022 - 11:43
Document Date
Wed, 04/18/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/18/2018 - 00:00
Page Number
48
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041820…

Task 3:

Nashua River:

Perform herbicide residue testing, assuming 6 sampling rounds and analysis of 2

sampling locations (12 samples total) is required

(Note: The number and frequency of post-treatment herbicide residue samples is determined by
the NH DPC following approval of the NH DES final treatment map. SOLitude is only responsible
for coordination of sample collection and has no influence on the number of samples required

by the Special Permit. Should additional sampling be necessary, there will additional charges of
$125/sample analyzed and $350-8500 per sample collection round.)

June — Oct $3,450.00 Payment due upon completion

Mill Pond and canal:

Perform herbicide residue testing, assuming 2 sampling rounds and analysis of 6

samples for each active ingredient (12 samples total) is required

(Note: The number and frequency of post-treatment herbicide residue samples is determined by
the NH DPC following approval of the NH DES final treatment map. SOLitude is only responsible
for coordination of sample collection and has no influence on the number of samples required

by the Special Permit. Should additional sampling be necessary, there will additional charges of
$250/sample analyzed and $350-$500 per sample collection round.)

June — Oct $4,450.00 Payment due upon completion

Task 4:
Nashua River: Perform post-treatment survey and submittal of the required written project completion
report to the State.

October $950.00 Payment due upon completion

Mill Pond and Canal: Perform post-treatment survey and submittal of the required written project
completion report to the State.

October $950.00 Payment due upon completion

Task 5:
Sandy Pond:
Pond Algae Treatment:

1. When requested, any infestation of algae found in the pond at the time of application, shall be
treated and controlled through the application of aquatic algaecides, aquatic herbicides, and
aquatic surfactants as required to control the specific varieties of algae present at the time of
service.

2. 2. Ponds which have more than fifty percent (50 %) coverage of undesirable algae will be treated
in a series of two (2) to three (3) applications as required to help prevent any damage to beneficial
aquatic life.

$495.00 Per Treatment
Note a single treatment is authorized at this time, additional treatments would require client
authorization

Page Image
Finance Committee - Agenda - 4/18/2018 - P48

Footer menu

  • Contact