Review and update design documents, including System Description,
Statement of Work, Project Schedule, and Acceptance Test Plan, based on O
Design Review agreements.
Execute Change Order in accordance with all material changes to the ‘e)
Contract resulting from the Design Review.
Deliverable: Finalized: design documentation based upon “frozen* design, along with any relevant Change Order
documentation.
Site Access
Provide site owners/managers with written notice to provide entry to sites 0
identified in the project design documentation.
Maintain access roads in order to provide clear and stable entry to sites for
heavy-duty construction vehicles, cement trucks and cranes. Ensure that 0
sufficient space is available at the site for these vehicles to maneuver under
their own power, without assistance from other equipment.
Obtain site licensing and permitting, including site lease/ownership, zoning, OQ
permits, regulatory approvals, easements, power, and telco connections.
Deliverable: Access, permitting, and licensing necessary to install system equipment at each site.
Equipment Order and Manufactoring
Create equipment order and reconcile to contract. O
Manufacture Motorola Solutions-provided equipment necessary for system OQ
based on equipment order.
Deliverable: Equipment procured and ready for shipment.
Equipment Shipment and Storage
Provide secure location for solution equipment .
Pack and ship solution equipment to the identified, or site locations.
Receive solution equipment.
QeVeo
VGVOo8
Inventory solution equipment
Deliverable: Solution equipment received and ready for installation
General Installation
Deliver solution equipment to installation location. O
Coordinate receipt of and inventory solution equipment with designated OQ
contact.
Install of all proposed fixed equipment as outlined in the System Description
based upon the agreed-upon floor plans, connecting audio, control, and
radio transmission cables to connect equipment to the power panels or Y O
receptacles, and audio/control line connection points. Installation
performed in accordance with R56 standards and state/local codes.
Provide system interconnections that are not specifically outlined in the
system design, including dedicated phone circuits, microwave links, or other M) oO
types of connectivity.