Finance Committee - Agenda - 6/20/2018 - P27

By dnadmin on Mon, 11/07/2022 - 11:35
Document Date
Wed, 06/20/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/20/2018 - 00:00
Page Number
27
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__062020…

Proposed Heritage Rail Trail Connection to Mine Fails Park

SECTION 00520
AGREEMENT BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT
(EJCDC FORM C-520, Modified)

THIS AGREEMENT is by and between _—_City of Nashua COwner”) and

George R Cairns and Sons Inc (‘Contractor’).

Owner and Contractor hereby agree as follows:
ARTICLE 1 —- WORK

1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents.
The Work is generally described as follows: The project includes construction of multi-
use trail and pedestrian bridge. The trail will consist of an ADA complaint ramp from the
Heritage Trail to an at-grade path along the western side of Everett Street. This path will
cross Ledge Street at a new cross walk with new rapid rectangular flashing beacons to
access the small existing park between Ledge Street and the Nashua Canal. A short
section of proposed concrete sidewalk will transition from the existing brick pavers in the
park to the 90-foot single span prefabricated steel truss pedestrian bridge supported on
helical piles and a reinforced concrete stub abutment.

ARTICLE 2 —~ THE PROJECT

2.01 The Project, of which the Work under the Contract Documents is a part, is generally
described as follows: Proposed Heritage Rail Trail Connection to Mine Falls Park

ARTICLE 3 — ENGINEER

3.01 The Project has been designed by Hoyle, Tanner & Associates, Inc.

3.02 The Owner has retained Hoyle, Tanner & Associates, Inc. Engineer”) to act as Owner's
representative, assume ali duties and responsibilities, and have the rights and authority
assigned to Engineer in the Contract Documents in connection with the completion of the
Work in accordance with the Contract Documents.

ARTICLE 4 — CONTRACT TIMES

4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and Final Completion and

readiness for final payment as stated in the Contract Documents are of the essence
of the Contract.

4.02 Contract Times: Days
A. The Work will be substantially completed within 170 days after the date when the

Contract Times commence to run as provided in Paragraph 4.01 of the General
Conditions, and finally completed and ready for final payment in accordance with

Hoyle, Tanner Project No. 902603 00520-1