Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/5/2018 - P46

Finance Committee - Agenda - 7/5/2018 - P46

By dnadmin on Mon, 11/07/2022 - 11:33
Document Date
Thu, 07/05/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 07/05/2018 - 00:00
Page Number
46
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070520…

CLD | Fuss & O'Neill

June 14, 2018

Mtr. Joe Mendola

City of Nashua

Division of Public Works
9 Riverside Street
Nashua, NH 03062

Re: Canal St. over Nashua River Bridge Repairs
Scope of Work and Fee Proposal — Weep Hole Installation & Concrete Repaits
CLD | Fuss & O’Neill Reference No. 20160362.000

Dear Mr. Mendola:

CLD | Fuss & O’Neill is pleased to submit the enclosed revised Scope of Work and Fee Proposal to
complete contract plans and construction services for the weep hole installation, and the concrete
repairs of the abutment and pier of the Canal Street Bridge over the Nashua River. ‘The scope has
been revised based on the City’s comments.

Haley and Aldrich has been retained on an on-call basis if further geotechnical services are needed,
please see their attached Scope of Work and Fee Proposal for a detailed description of their services.
Also included with this letter is CLD | Fuss & O”Neill’s Task List with Estimated Hours and Fee.

CLD | Fuss & O’Neill’s work will be separated into two stages; the first stage will consist of the
weep hole installation, and the second stage will be the concrete repairs of the abutment and the
pier. The scope of work shall include:

e Preparation of Contract Plans — Weep Hole Installation: A detail for the installation of
the weep holes at the east abutment will be prepated; plans are expected to consist of one
sheet that includes the installation detail and all applicable notes. One submission to the City
for review is anticipated. Plans will be revised based on the City’s comments.

e Field Inspection: Conctete inspection of the east abutment and pier will be conducted to
determine the limits of the concrete repairs. Inspection will consist of visual inspection and
hammer sounding of accessible surface. The area of repair will be estimated based on the
visual findings only for inaccessible surface, i.e. if the pier cannot be reached due to water
conditions.

e Preparation of Contract Plans — Concrete Repairs: Details for concrete repairs of the
eastern abutment and pier will be prepared. One submission to the City for review is
anticipated. Plans will be revised based on the City’s comments.

e Preparation of Bid Form and Special Provisions: CLD | Fuss & O’Neill will prepate the

bid form and special provisions, for both the weep hole installation and the concrete repairs,
to be included in the Contract Documents. Standard NHDOT will be used as applicable;

CONNECTICUT | MAINE | MASSACHUSETTS | NEW HAMPSHIRE | NEW YORK | RHODE ISLAND | VERMONT

540 Commercial Street @ Manchester, NH 03101 © ph: 603.668.8223 © fx: 603.668.8802 © www.cldengineers.com

Page Image
Finance Committee - Agenda - 7/5/2018 - P46

Footer menu

  • Contact