Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/5/2018 - P24

Finance Committee - Agenda - 7/5/2018 - P24

By dnadmin on Mon, 11/07/2022 - 11:33
Document Date
Thu, 07/05/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 07/05/2018 - 00:00
Page Number
24
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070520…

Where possible all roots systems of trees, shrubs and vines must be removed. Trees larger than 2 inches
may be cut at the base of the trunk. No herbicide spraying will be done at this location due to the
proximately to the Merrimack River. All rip-rap must be restored to existing conditions.

IV. Scope
A. Work Completion

Hired vendor will remove any vegetation as describe above and as noted by City. The City will inspect
work for completeness and approval.

B. Debris Removal

The vendor is solely responsible to remove all vegetation clippings off of the project location. The
clippings shall be chipped and brought to and disposed of at the City’s landfill.

C. Landfill

All debris shall be chipped and then brought to the City of Nashua Landfill. Before the start of the
project the landfill needs to be contacted and delivery schedule arranged. All deliveries shall be a
coordinated effort between the Vendor and City of Nashua Landfill. Contact information for the City of
Nashua Landfill:

Jeffrey Lafleur, Superintendent of Solid Waste
City of Nashua, Solid Waste Department
Email: Lafleur] @NashuaNH.gov

D. Walk through

A mandatory pre-bid meeting will be held on May 14, 2018 at the site location near 60 Crown Street at
1:00pm. All vendors are required to send a representative to the pre bid meeting. This walk through is
an opportunity for the City to answer any questions relating to the project and allow vendors to view
the current condition and the scope of work. The walk through will include work zone boundaries,
understanding the scope of work, vehicle and machine/equipment access points, and working
conditions.

E. Access Roads

Access to the rip-rap work zone is a service road located off of Bancroft Street. See attached Figure 1 for
the location of the service road. This service road is parallel with Bridge Street and next to the new
Renaissances Development.

Access to the concrete floodwall is through Sanders Street. See attached figure 2 for the location of the
service road.

Vehicles and machine/equipment access maybe limited due to steep grading for both access roads.