Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/5/2018 - P23

Finance Committee - Agenda - 7/5/2018 - P23

By dnadmin on Mon, 11/07/2022 - 11:33
Document Date
Thu, 07/05/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 07/05/2018 - 00:00
Page Number
23
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070520…

| THE CITY OF NASHUA “The Gate Chy

Division of Public Works

Eingneering Department EXHIBIT A

REQUEST FOR BIDS
Vegetation Removal of the Nashua Levee

The City of Nashua Division of Public Works invites qualified vendors to submit a proposal for the
removal of vegetation along a rip-rap area located on the Merrimack River — Right Bank Flood Damage
Reduction Systems, known as the Nashua levee system.

|. Background

About 1948, The US Army Corps of Engineers (USACE) constructed a levee system to protect 70 low lying
areas at the confluence of the Nashua and Merrimack Rivers. Once constructed, the City became the
owner of the levee system with the USACE retaining the right to inspect and regulate the operation of
the system. Recent inspections of the levee system has identified a need to remove unwanted
vegetation from the rip-rap slope of the embankment and bridge abutment and the concrete floodwall
areas as shown on Figure 1 and 2, respectively.

ll. Project Time Line

Item Date Location/Time
Mandatory Pre-Bid Meeting 5/14/18 60 Crown Street @ 9:00 am
Deadline for Question to be Submitted 5/15/18 4:00 pm
Bid Due 5/18/18 Engineering Department DPW

Vendors are encouraged to submit questions via email however; the City of Nashua assumes no liability
for assuring accurate/complete email transmission/receipt and is not responsible to acknowledge
receipt. Inquires must be submitted in writing to:

Mark Saunders, Assistant Construction Engineer,
City of Nashua, Division of Public Works
Email: Saundersm@NashuaNH.gov

Ill. Project Description

This work shall include the remove of all vegetation growing in the rip-rap slope and concrete floodwall
areas as described above and shown on Figure 1 and 2.

A large amount of vine growth exists, including but not limited to poison ivy. To the maximum extent
possible all vines must be cut and removed from the area. All trees of, including saplings will be cut.

9 Riverside Street * Nashua, New Hampshire 03062 * Phone (603) 589-3120 * Fax (603)
589-3169

Page Image
Finance Committee - Agenda - 7/5/2018 - P23

Footer menu

  • Contact