IFB1087-041718
2018 CIPP Lining Projec
City of Nashua, New Hampshire ining Project
Division of Public Works
2018 CIPP Lining
Change Order No. 1
Item No. Change. Units Item Description Unit Price Total Price
——" Order i — — ——
Quantity
1k (3) 238 LE 8” CIPP Per foot $25 $25.00 $5,950.00
ik (8a) 238 LF 8” Pre CCTV Per toot $3.50 $3.50 $833.00
1k(8b) 238 LF 8” Post CCTV Per foot $1 $1.00 $238.00
1k(10) 1279 LF 10” CIPP 278 Per foot $27.00 $34,533.00
1K(10a) 1279 LF 10” Pre CCTV Per foot $3.50 $3.50 $4,476.50
1k(10b) 1279 LF 10” Post CCTV Per foot $1 $1.00 $1,279.00
1k(12) 1,580 LF 12" CIPP Lining (increase ) $30.00 $47 400.00
1k(12a) 1,580 LF Pre-Lining Video for 12" Pipe CIPP Lining (increase) $3.50 $5,530.00
ik(2b) 1,580 LF Post-Lining Video for 12" Pipe CIPP Lining (increase) $1.00 $1,580.00
In 24 EA Cutting and Removal of Protruding Lateral Pipe
| Up to 12" Diam. (increase) $285.00 $6,840.00 |
100 70 VE Manhole Lining - Cement $154.00 $10,780.00
2s(8-10m) 5 EA Root Cutting 8'-10" Pipe - Medium Roots $110.00 $550.00
[ Total CO 1 i $119,989.50
Total Original Contact $715,657.50
Total $835,647.00
Contractor:
wrized Signature:
Date:
Change Order #1 BS - 1 of 1