From: Dan Kooken, Purchasing Manager
Re: 2018 CIPP Lining - Change Order No. 1 (Value: $120,000)
MOTION BY ALDERWOMAN KELLY TO ACCEPT, PLACE ON FILE AND APPROVE CHANGE ORDER #1
TO THE CONTRACT WITH LAYNE INLINER IN THE AMOUNT OF $120,000. FUNDS ARE AVAILABLE IN
DEPARTMENT 169, WASTEWATER
ON THE QUESTION
Alderman Harriott-Gathright
What is the CIPP Line just curious?
Mayor Donchess
Alderman Laws?
Alderman Laws
It is just something for a disintegrating sewage pipe that they shoot inside of it basically and it prevents it, even
though the outside is deteriorating it will keep the inside secure.
Mayor Donchess
It’s like a liner, it is the most cost-effective way of repairing this stuff.
Alderman Laws
The pipes we are using were some were built in the late 1800’s so it is cheaper way of avoiding replacing
these pipes and digging up the streets; people love that.
Mayor Donchess
Cheaper at $1120,000.00 but to re-do it would be probably 5 times that.
Alderwoman Kelly
Just because we are on it I’m interested in how many times they can line it before they eventually have to
replace it?
Mayor Donchess
| think this lasts for decades, but it is a plastic like material, this stuff is very durable.
Mr. Caggiano
| think they can only reline it once, after that it deteriorates and we'll have to replace.
Mayor Donchess
But it lasts along time. Anything else? If | remember will try to ask how long CIPP lasts.
MOTION CARRIED