Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 9/5/2018 - P204

Finance Committee - Agenda - 9/5/2018 - P204

By dnadmin on Mon, 11/07/2022 - 11:29
Document Date
Fri, 08/31/2018 - 12:49
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/05/2018 - 00:00
Page Number
204
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__090520…

EXHIBIT A
iFB0465-080118
Design/Build - Fuel Island Upgrade

CONTRACTOR SCOPE OF WORK

CONTRACTOR shall prepare design plans for the construction of a new Fuel Island Upgrade .The design
plans shall meet the following requirements:

>
>

>

Plans to be prepared by a licensed State of New Hampshire Professional Engineer.
Plans must conform to State Environmental Regulations and be approved by the New
Hampshire Division of Environmental Services (NH-DES).

Plans must be submitted to the City for review and approval.

CONTRACTOR shall provide all necessary materials, labor, and equipment for the installation of four (4)
new fuel dispensers and pans and installation of underground Diesel and Unleaded piping per the
specifications below:

INSTALLATION OF FUEL DISPENSER — AND PANS

>

Remove existing fuel shack, dispensers, Fuelmaster and Veeder-Root systems, and light poles,
close and dispose of the existing product pipe. Include required soil samples, field screening and
State Closure Report.

Install four (4) dispenser sumps with associated entry boots.

Replace the existing pumps with new Bennett 3000 Series electronic commercial remote

dispensers or equivalent.

Re-install existing Veeder-Root monitoring equipment; replace sensors as needed.

Re-install existing Fuelmaster system.

Electrical to include labor and materials to connect the new equipment to the existing electrical
system. Run new outside conduit and wire as needed.

Concrete will include fueling apron and two housekeeping pads around the transition sumps.
The island forms will be 3’xx’x9” stainless steel.

INSTALLATION OF UNDERGROUND DIESEL AND UNLEADED PIPING

Install piping transition sumps with associated entry boots and pipe supports.
Install as needed 1.5” Omega Flex DoubleTrac double walled flexible piping and fittings or

equivalent installed in 4” ducting.
Install new hoses, breakaways, swivels and automatic nozzles. %” for Unleaded and 1” for
Diesel.

Page 1 of 2