A-3.5
ALTERNATE A
Difference in cost to fumish and install complete
A-1 | Grundfos CR 64-2 A-G-A-E-HQQE (Owner-preferred 1 N/A included
vertical multistage centrifugal pumps for Pumps #1, #2, in Base Bid EL
and #3 per Section 33 14 45). (insert $0 for od)
LS price)
@ “ZY
ADD DO
___Dollarsand (J Ceents DEDUCT O
Difference in cost to furnish and install complete
A-2 | Grundfos CR 20-4 A-GJ-A-E-HQQE (Owner-preferred 1 N/A included
vertical multistage centrifugal pump for Pump #4 per ia Base Bid Oo,
Section 33 14 45). (insert $0 for
price)
@ ZyKe b ay
ADD O
Dollars and v Cents DEDUCT Ci
of Proposed Construction Sequencing per Section 01 11 00 and the Drawings
Vf DBE Subcontractor Utilization Form (EPA Form 6100-4)
We DBE Subcontractor Performance Forms (EPA Form 6100-3) Submit one form for each DBE
subcontractor
y BIDDER’S Americana Iron and Steel acknowledgement