49
2018 Sewer Replacement - Harvard St
Change Order No. 2
Harvard Street Sewer Replacement Quantities
Northeast Earth Mechanics
so Bid Item Description
Quantity| Units Unit Price Cost
ib |Remove Existing Sewer and Replace with 12 inch PVC Sewer SDR-35 830 LF $410.00 $340,300.00
if Replace Existing MH with 4' Diam. Sewer Manhole 40 VF $1,000.00 $40,000.00
2b _|Remove Drain Pipe and Repl, with 8 - 12" PVC SDR-35 Drain Pipe 275 LF $150.00 $41,250.00
6e Temporary Bituminous Pavement 375 TON $1.00 $375.00
6g |Sawed Bituminous Pavement 1,210 LF $0.01 $12.10
8b | Flagmen 1 Allowance] $8,000.00 $8,000.00
8c Maintenance of Traffic 1 LS $10,000.00 $10,000.00
8} Remove and Reset Stop Sign 1 EBA $100.00 $100.00
$440,037.10