PART II - PRICE SUMMARY
COMPETITOR'S CATALOG LISTINGS, IN-HOUSE ESTIMATES, PRIOR QUOTES
(Indicate basis for price comparison)
MARKET
PRICE (S)
PROPOSED
PRICE
PART IV - DIRECT LABOR BY CATEGORY
14. INSERT THE APPROPRIATE WORK CATEGORY IN THE TABLE BELOW. WORK CATEGORIES WOULD INCLUDE BUT
NOT BE LIMITED TO THOSE CATEGORIES SHOWN IN THE CONTRACT DOCUMENTS SUCH AS DESIGN, SURVEY,
SUBSURFACE, CADASTRAL, O&M MANUAL, ADMINISTRATION, INSPECTION, RECORD DWGS, START-UP, SPECIAL
SERVICES, ETC.
Work category =
3g bp Sp ob £ Bs
Sel el al Bb Bal rom
~ : 3
E g E A > A &— & <j} Hours | Rate Cost
> oo * 2 = 3 = E S
bet 2 wn = = a:
oF Ay a) wn a mt Be OO Ay
TOTAL HOURS 135 20 265.5 50 293 38 801.5
Client Manager 14 4 18 $82 $1,476
Project Manager 8 4 8 16 g 20 64 $57 $3,648
Lead Project Engineer 40 g 40 12 40 g 148 $37 $5,476
Sr. Technical Advisor 8 4 4 16 $g2 $1,312
SCADA Engineer 30 30 60 $45 $2,700
Sr. Electrical Engineer 65 6 12.5 $57 $713
Electrical Engineer 55 55 110 $37 $4,070
Staff Engineer 75 8 60 8 60 211 $27 $5,697
Sr. Structural Engineer 4 4 8g $57 $456
Structural Engineer 30 30 60 $37 $2,220
Cost Estimator 24 24 $49 $1,176
Technical Specialist 40 $1,840
HVAC 2D a S46
Project Specialist 4 8 8 10 30 $28 $840
$31,624
Total - Direct Labor Cost