ENGINEERING DESIGN PHASE CONTRACT
For Professional Services for Treatment Works
IV. Compensation to be Paid the ENGINEER
A,
Method of Payments
1. | Payment to the ENGINEER, for services
rendered, shall be according to the following
schedule:
Monthly billing based on hours and rates
by labor category with mark-up and inci-
dental expenses in accordance with the
attached fee schedule.
2. The OWNER agrees to pay and the ENGI-
NEER agrees to accept for all services under this
AGREEMENT, a fee not to exceed
One hundred and five thousand, six hundred and
Dollars
($105,600).
3. If separate documents are required for
additional construction contracts on this PRO-
JECT, an additional fee as approved by the
DIVISION shall be paid to the ENGINEER.
4. Prior to formal approval of contract docu-
ments by the DIVISION, the ENGINEER shall
make such revisions in them as recommended by
the DIVISION and agreed to by the ENGINEER
without additional compensation. After formal
approval, if it becomes necessary to revise the
contract documents for reasons beyond the
control of the ENGINEER, payment for such
revision or revisions shall be made to the ENGI-
NEER subject to approval by the DIVISION.
Limits of All Payments
1. The ENGINEER hereby assures the
OWNER and agrees that the following fee for his
services (exclusive of surveys, borings. and
certain special services which follow) in con-
nection with the preparation of final plans, speci-
fications, and contract documents and other work
as generally described under I(A) is adequate to
complete the assignment and shall not exceed
To Be Determined
Dollars
($ ).
Water Booster Upgrades Design Engineering Contract - Woodard & Curran. doc
C1 Amounts of Fees
Page 3 of 6
2. It is also agreed that payment to the ENGI-
NEER for services in relation to engineering
surveys, including layout and logging of borings,
probings or seismic surveys, together with plats
and project related special services shall be at
actual cost. Actual cost shall include compensa-
tion to the ENGINEER for his work performed
on these services. The ENGINEER further agrees
that the work proposed under this item is enough
to satisfactorily complete the contract documents
and that the moneys to be paid under this item are
adequate for the work proposed and shall not
exceed
To Be Determined
Dollars
($ ).
5. It is again agreed that payment to the EN-
GINEER for services in relation to subsurface
exploration. including borings, probings or
seismic surveys, shall be at actual cost as defined
in IV (B) 2. The ENGINEER further agrees that
the work proposed under this item is enough to
satisfactorily complete the contract documents
and that the moneys to be paid under this item are
adequate for the work proposed and shall not
exceed
To Be Determined
Dollars