Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/4/2017 - P26

Finance Committee - Agenda - 1/4/2017 - P26

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 01/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/04/2017 - 00:00
Page Number
26
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010420…

ENGINEERING DESIGN PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS

CITY/TOWN OF NASHUA, NEW HAMPSHIRE

This AGREEMENT made and entered into at Hillsborough County, New Hampshire, this
day of 20 , by and between City/Town of Nashua, New Hampshire hereinafter called
the OWNER, and Woodard & Curran hereinafter called the ENGINEER.

WITNESSETH:

WHEREAS, the OWNER intends to construct a potable water booster station described within the
Request for Qualifications titled “Water Booster Station Upgrades Project at NWTF (RFQ0265-060316)”
dated May 13, 2016 consist of a preliminary design report and commencing in final design, specification sand
bidding documents. This includes the relocation and/or reconfiguration of the booster water station as well as
upgrading for integration into the OWNER’s Supervisory Control and Data Acquisition (SCADA) system.
Final design and bid copies will be provided for the upgrade to the potable water booster station generally
known as the: Water Booster Station Upgrades Project hereinafter called the PROJECT, and

WHEREAS, professional engineering services will be required for the preparation of plans and
specifications and contract documents, and

WHEREAS, such services are of a distinct professional nature and hence not subject to the bidding
process,

NOW THEREFORE, in consideration of these premises and of the mutual covenants herein set forth,
the OWNER hereby employs the ENGINEER to furnish the following engineering services in connection with
the proposed PROJECT; and it is agreed by and between the OWNER and the ENGINEER as follows:

Water Booster Upgrades Design Engineering Contract - Woodard & Curran.doc 208A

Page Image
Finance Committee - Agenda - 1/4/2017 - P26

Footer menu

  • Contact