Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/4/2017 - P24

Finance Committee - Agenda - 1/4/2017 - P24

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 01/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/04/2017 - 00:00
Page Number
24
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010420…

building and areas to be dehumidified or air-conditioned will also need to be finalized
during detailed design.

i e. Safety: Design will meet or exceed any and all regulatory requirements for the safe
A operation of a water booster station.

a
a

>. f, Instrumentation and Controls: Work with the Client to develop a conceptual process
am. <=, instrumentation and contro! strategy, and integrate with the newly upgraded
WOODARD Supervisory Control and Data Acquisition (SCADA) system.
& CURRAN g. Electrical: Provide a power conditioning uninterruptable power suppiy (UPS) with

monitoring signals installed and visible in SCADA.
h. Construction cost estimate (Estimate of Probable Costs).

4, eet with the Client to deliver and ciscuss the 65% design. Incorporate comments and revisions
as part of the final design.

5. Develop 90%design plans and specifications for Client review including:

a. Final Drawings and Specifications
b. Updated Construction Cost (Estimate of Probable Costs)

6. Incorporate Client's final comments anc deliver fiat design package.
ASSUMPTIONS
‘1. Scope of services does not include surveying or geotechnical investigations.
2. Aneweiectric service is not considerea necessary at this time.
The Scope of Services will be completed for a totai price of $105,600.00

Phase 1 — Design shail be bilie¢ hourly at the rates specified in the NH DES Contract, not to exceed
$105,600.00 This budget will not be exceeded without prior written authorization by the Client.

Woodard & Curran will complete the work for the above phase based on the foilowing schedule:
Preliminary Design iviemo shall be completed within iwo monihs of the notice to proceed date.
65% design shall be completed within four months of the notice to proceed date.

90% design shall be completed within six months of the notice to proceed date.

Final design package shali be completed within eight months of the notice to proceed date if Client
provides final comments within 45 days of 90% design package delivery.

PwnN>

City of Nashua (228730.18) 2 Woodard & Curran

2016.12.13 Nashua Water Booster PS Proposai - DRAFT
R34 December 16, 2016

Page Image
Finance Committee - Agenda - 1/4/2017 - P24

Footer menu

  • Contact