Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/4/2017 - P11

Finance Committee - Agenda - 1/4/2017 - P11

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 01/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/04/2017 - 00:00
Page Number
11
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010420…

COMMERCIAL SALES AGREEMENT TOWN NO. CUSTOMER NO. JOB NO. PONO. ESTIMATE NO.
0069-MANCHESTER, 1-21SW9JI

NH

SCOPE OF WORK / SCHEDULE OF PROTECTION

IW. SCOPE OF WORK / SCHEDULE OF PROTECTION (“SOW”): Tyco agrees to install or cause to be installed the Equipment and furnish the Service(s), collectively, the System, on the terms
and conditions set out in this Agreement.

A. Ownership of System and/or Equipment: Direct Sale (equipment to become property of the Customer upon payment of installation Charges and Fees in full.

B. Services to be Provided (“Services”)

Alarm monitoring and Notification Services: No Service Selected
Video Surveillance Services: No Service Selected
Managed Access Control Services: No Service Selected
Video Equipment: No Service Selected
Quality Service Pian(QSP)Maintenance; Preventive Maintenance/Inspection: No Service Selected
Additional Services: Access Control

C. Equipment to be Installed (“Equipment”): Tyco will install, or cause to be installed, the Equipment (or equivalent), as set forth in this SOW in Customer's designated facility(ies). As used
herein, “installation” means: (i) affixing all Equipment and materials provided by Tyco at such locations within the facility(ies} as are designated by Customer, (i) providing and pulling
cableshwires required to connect the Equipment to Customer's Communications Facilities and making such connections; (if), in the case of a Digital Communicator installation, mount
Equipment and plug into RJ31X phone jack previously installed by Customer; (iv) in the case of radio installation, mount radio Equipment and program Equipment with number fumished by
Customer, (v) providing and installing software/firmware required by the Equipment; (vi) performing testing as required to establish that the Tyco Equipment is connected, is functioning
according to its specifications, and is communicating over Customer's Communications Facilities; and (vii) providing user-level training to Customer's designated representative in the use of
such Equipment.

Qty | Product Name Location |

Locksmith

=

4-Door Controller, IP Ready, Accessory Kit, Metal Cabinet w/ Lock
Transformer for KT-400, wire-in, 120 VAC/16.5 VAC (75 VA), UL approved
Surface Screw Mount Magnetic Contact with leads, SPST Switch (Form A), Gray

=

ve

aaa

c—

ProxPro Wiegand, Gray, Keypad, 26 bit keypad output |
4 | T-REX PIEZO NO LOGO, WHITE | |

D, Scope of Work: This Section is intended for installation use only. Any language contained in this Section that attempts to modify the Terms and Conditions of this Agreement shall be void and
of no effect.

Contact Information: Please contact Nick Miseirvitch at (603) 589-3305 or at MiseirvitchN@nashuanh.gov

System Operation: Tyco Integrated Security shail: A. instafl (1) Kantech KT-400 control panel in the conference room near the LCD Monitor. The KT-400 will be tied into the local area network and
will be accessible via Entrapass software from City Hall. The Door Strikes will be powered by the on-board power supply. B. Add (4) Doors of Access Control to the system which will include a
combination card reader and keypad, door status contact and request fo exit motion detector 1. Main Entry Outer Door 2. Main Entry Inner Door 3. Service Bay to Office Door 4. Engine Bay to Office
Door C. Program system D. Train end-user on basic use of the system after installation

Programming Info: Door schedules to be determined by City of Nashua

Site Conditions: Existing site

Existing Equipment N/A

Customer Expectations: Installation shall take place Monday - Friday between 8am and 5pm

Training Expectations: Tyco technician shall train end-user on basic use of the system after installation

General Comments: N/A
Customer Responsibilities / Tyco Exclusions: City of Nashua is responsible for the following: 1. Provide access to all areas required for installation Monday - Friday between 8am and §pm 2. Provide

(1) 120V electrical connection for the Kantech KT-400 control panel 3. Provide network connection for the Kantech KT-400 control panel 4. Be available for end-user training with the Tyco technician

at the end of the installation
Documentation Needs: N/A

Contract Notes -

e-Form 888GUE01 (09/2015) Page 2 of 6
© 2015 Tyco. All Rights Reserved

Page Image
Finance Committee - Agenda - 1/4/2017 - P11

Footer menu

  • Contact