tyco
Integrated Security
ao F &
Programming Info:
Site Conditions:
Customer Expectations:
Training Expectations:
Customer Responsibilities / Tyco Exclusions:
© TYCO 2015. ALL RIGHTS RESERVED
City of Nashua
70 E Hollis St
Nashua, NH 03060
Estimate Name: Nashua Fire Dept E Hollis St Access 7-6-16
following:
A. Door 1 (Inner Vestibule Door) —
Locksmith will furnish and install an Adams
Rite Electric Strike
B. Door 2 (Outer Vestibule Door) —
Locksmith will furnish and install a Rim
Strike
C. Door 3 and 4 (Service Bay to Office Door
and Engine Bay to Office Door) — Locksmith
will furnish and install electrified cylindrical
levers with latch guards.
Door schedules to be determined by City of
Nashua
Existing site
Installation shall take place Monday - Friday
between 8am and 5pm
Tyco technician shall train end-user on
basic use of the system after installation
City of Nashua is responsible for the
following:
1. Provide access to all areas required for
installation Monday - Friday between 8am
and 5pm
2. Provide (1) 120V electrical connection for
the Kantech KT-400 control panel
3. Provide network connection for the
Kantech KT-400 control panel
4. Be available for end-user training with the
Tyco technician at the end of the installation
TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION
Page 5 of 7