T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 13A
230 Commerce Way, Suite 302
jProposai Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 1/6/2017
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Coda:
Portsmouth, NH 03801
Job Location:
Nashua NH
Engineer
Andy Mornill
Job Phone:
la hereby submit specifications and estimate for: ‘
Material
Labor
15% O&P
GC O&P 10%
TOTAL
fpayment for this extra work it will be under a separate proposal
Provide labor, material and equipment to offset 30" odor Control duct to avoid conflict with generator drain
$ 875.00
5 900.00
$ 1,775.00
$266.25
“$2,041.25
$
$
1) T Buck will request a 2 day extension to the contract completion time if this proposal is excepted
2) Price is based on Electrical Installation relocate two light fixtures that will interferes with new duct location at no cost, if El requests
TWO THOUSAND, TWO HUNDRED & EIGHTEEN DOLLARS
(We Propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of:
AI! material is guaranteed to be as specified. Ai work to be completed ina
workmanlike manner according to standard practicas. Any alteration or
deviation from above specifications involving extra costs will be executed only
upon written orders, and will becoms an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents ar delays beyond
Authorized
Signature
Mark McPheters
Note: This proposal may be withdrawn
ur contrat. Gwner to carry fire, tomado and other necessary insurance. Gur by us if not accepted within 5 days.
Wwarkers are fully covered by Warkman's Compensation Insurance.
Acceptance of Proposal- The above prices, specifications and
Date of acceptance Signature