T. Buck Construction, Inc.
249 Merrow Rd Aubum, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 8
230 Commerce Way, Suite 302
{Proposal Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 12/16/2016
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Code:
Job Location:
aviation from above specifications invalving extra costs will be exacited only
hipon written orders, and will become an axtra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Portsmouth, NH 03801 Nashua NH
Engineer: Job Phone:
Andy Mornll
e hereby submit specifications and estimate for:
Provide labor, material and equipment to relocate rain leader in main hallway as reviewed with Kristen Lemasney
Material $ 4,823.20
Labor $ 2,400.00
$ 7,223.20
18% O&P $ 1,083.48
$ 8,306.68
GC O&P 10% $ 122.32
TOTAL $ 9,028.00
1) T Buck will request a 3 day extension to the contract completion time if this proposal is excepted
2) Price does not include finish paint of pipe
e Propose hereby to fumish material and labor complete in accordance with above specifications, for the sum of.
NINE THOUSAND & TWENTY NINE DOLLARS
All material is guaranteed to be as specified, All work to be completed in a Authorized
Wworkmaniike manner according fo standard practices. Any alteration or Signature
Mark McPheters
Note: This proposal may be withdrawn
Date of acceptance
i work as specified. Payment will be made as outlined above.
ur control. Owner to carry fire, tomado and other necessary insurance. Our by us if not accepted within & days.
workers ata fully covered by Workman's Compensation insurance.
Acceptance of Proposal- The above prices, specifications and
Signature