T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 4
230 Commerce Way, Suite 302
Proposal! Submitted ta: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 12/16/2016
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Code:
Job Location:
Portsmouth, NH 03801 Nashua NH
Engineer. Job Phone:
Andy Momill
[Wwe hereby submit specifications and estimate for:
Provide labor, material and equipment to replace damaged duct work in wetwell as reviewed with Andy Morrill
Material $ 590.00
Labor $ 600.00
$ 1,190.00
15% O&P $ 178.50
$ 1,368.50
GC O&P 10% $ 119.00
TOTAL $ 1,487.50
1) T Buck will request a 2 day extension to the contract completion time if this proposal is excepted
We Propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of:
ONE THOUSAND FOUR HUNDRED & EIGHTY SEVEN DOLLARS
Ali material is guaranteed to be as specified. All work to be completed in a
workmanlike manner according te standard practices. Any alteration or
deviation from above specifications involving extra costs will be executed only
hupon written orders, and wilt become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Authorized
Signature
Mark McPheters
Note: This proposal may be withdrawn
our control. Owner to carry fire, tomado and other necessary insurance. Our by us if not accepted within § days.
workers are fully covered by Workman's Compensation insurance.
Acceptance of Proposal- the above prices, specifications and
Date of acceptance Signature
le work as specified. Payment will be made as outlined above.