T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 10
230 Commerce Way, Suite 302
Proposal Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 12/1/2016
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
fCity, State & Zin Code:
Portsmouth, NH 03801
Job Location:
Nashua NH
Engineer:
Andy Momill
Job Phone:
fe hereby submit specifications and estimate for:
Provide labor, material and equipment to provide and install four piece shower in womens locker room.
4 piece shower
CREDIT SHOWER
15% O&P
GC O&P 10%
TOTAL
$ 1,890.00
$ 385.00
$ 1,505.00
$ 225.75
$ 1,730.75
$ 150.50
$ 1,881.25
EIGHTEEN HUNDRED & EIGHTY ONE DOLLARS
We Propose hereby to furnish material and labor complete in accordance with above specificatians, for the sum of:
AJ! material is guaranteed to be as specified. All work to be completed in a
workmanlike manner according to standard practices. Any alteration or
Meviation from above specifications involving eatra costs will be executed only
Ripon written orders, and will become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Authorized
Signature
Mark McPheters
Note: This proposal may be withdrawn
our control. Owner to carry fire, tornado and other necessary insurance. Our by us if not accepted within 5 days.
workers are fully covered by Workman's Compensation Insurance.
Acceptance of Proposal- the above prices, specifications and
Date of acceptance Signature
f work as specified, Payment will be made as outlined above.